Seattle Passive Solar Home Remodel

The story of a growing family redesigning and renovating their home to make it larger, greener, and more sustainable in an urban environment.

10.21.2011

Kitchen

Almost there!
Posted by Ryan at 8:20 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

9.19.2011

Wood floors with first coat of finish

Posted by Ryan at 3:17 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

9.14.2011

Upstairs wood flooring installed

Posted by Ryan at 8:12 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Wood flooring installed on stair treads

Posted by Ryan at 8:09 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Woodflooring upstairs

Posted by Ryan at 3:03 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

9.12.2011

Exterior Paint: Battle of the Blues Continued

Had to put some on the siding.
Posted by Ryan at 6:58 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook

Exterior Paint: Battle of the Blues

And the orange we had initially selected was a casualty too!
Posted by Ryan at 6:57 PM 0 comments
Email ThisBlogThis!Share to TwitterShare to Facebook
Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ▼  2011 (129)
    • ▼  October (1)
      • Kitchen
    • ►  September (15)
      • Wood floors with first coat of finish
      • Upstairs wood flooring installed
      • Wood flooring installed on stair treads
      • Woodflooring upstairs
      • Exterior Paint: Battle of the Blues Continued
      • Exterior Paint: Battle of the Blues
      • Bathrooms primed for tile
      • Drywall Upstairs
      • Drywall in Living Room Continued
      • Drywall in Living Room
      • Drywall continued #1
      • Drywall
      • Exterior siding on the addition #1
      • Exterior siding on the original house
      • Exterior Colors
    • ►  July (3)
      • Dropped ceiling at intersection of structures
      • Old and New House Roof Intersection
      • Windows and moisture barrier
    • ►  June (10)
      • Framing the Courtyard Entrance
      • Roughing in the Plumbing Two
      • Roughing in the Plumbing
      • Ceiling Joists for Second Floor
      • Second Floor Framing from Courtyard Exterior
      • Second Floor Framing from Interior
      • Views from the Second Floor
      • Prepping Second Floor Base for Floor Joists
      • Trombe Walls Revealed
      • Prepping for the Second Story: New Beams
    • ►  May (28)
      • Exterior First Floor Wall in front of Trombe Walls...
      • Sun Facing Side of Trombe Walls Unveiled
      • Framing for the Downstairs Bedrooms, Bathroom, and...
      • View from the Street
      • Entry Footing and Wall Poured
      • More Prep Work for Trombe Walls
      • Second Layer of Rebar and Further Reinforcement of...
      • Entry Wall Form
      • Trombe Wall Forms Viewed from the West
      • North Side of the Trombe Wall Forms
      • Trombe Wall Rebar and Concrete Form Panel Ties
      • Side Panels for Trombe Wall Forms
      • The Foreman Arrives to Inspect the Trombe Wall For...
      • Concrete Form for Footer under Entry Wall
      • Trombe Wall Forms
      • Sheeting the First Story Addition
      • North and East First Floor Walls Framed
      • Framing of the First Floor Addition Begins
      • Bite Taken out of the Roof
      • First Floor Plates Added on Addition
      • Floor Patch Complete with Consistent Subfloor Thro...
    • ►  April (26)
    • ►  March (40)
    • ►  February (5)
    • ►  January (1)
  • ►  2007 (1)
    • ►  May (1)

What we are reading...

  • CASTarchitecture
  • Fab.com | daily design for everyone
  • Green design will save the world | Inhabitat
  • MoCoLoco
  • Remodelista: Sourcebook for the Considered Home

Ads by Clickochet!

Ads by Clickochet!

Picture Window template. Powered by Blogger.