Seattle Passive Solar Home Remodel

The story of a growing family redesigning and renovating their home to make it larger, greener, and more sustainable in an urban environment.

5.28.2011

Exterior First Floor Wall in front of Trombe Walls

Posted by Ryan at 3:45 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

5.27.2011

Sun Facing Side of Trombe Walls Unveiled

Posted by Ryan at 12:11 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Framing for the Downstairs Bedrooms, Bathroom, and Laundry Room

Posted by Ryan at 12:10 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

5.26.2011

View from the Street

Sent from my iPhone
Posted by Ryan at 9:17 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Entry Footing and Wall Poured

Posted by Ryan at 9:16 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

More Prep Work for Trombe Walls

These photos were shot post pour. The forms should be coming off soon.
Posted by Ryan at 9:15 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

5.23.2011

Second Layer of Rebar and Further Reinforcement of Forms for Trombe Walls

Posted by Ryan at 9:51 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Entry Wall Form

Posted by Ryan at 9:49 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

5.19.2011

Trombe Wall Forms Viewed from the West

Posted by Ryan at 7:39 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

North Side of the Trombe Wall Forms

Posted by Ryan at 7:38 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Trombe Wall Rebar and Concrete Form Panel Ties

Posted by Ryan at 7:37 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Side Panels for Trombe Wall Forms

Posted by Ryan at 7:35 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

The Foreman Arrives to Inspect the Trombe Wall Forms

Posted by Ryan at 7:34 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Concrete Form for Footer under Entry Wall

Posted by Ryan at 7:33 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

5.18.2011

Trombe Wall Forms

Posted by Ryan at 9:25 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ►  2014 (1)
    • ►  February (1)
  • ▼  2011 (129)
    • ►  October (1)
    • ►  September (15)
    • ►  July (3)
    • ►  June (10)
    • ▼  May (28)
      • Exterior First Floor Wall in front of Trombe Walls
      • Sun Facing Side of Trombe Walls Unveiled
      • Framing for the Downstairs Bedrooms, Bathroom, and...
      • View from the Street
      • Entry Footing and Wall Poured
      • More Prep Work for Trombe Walls
      • Second Layer of Rebar and Further Reinforcement of...
      • Entry Wall Form
      • Trombe Wall Forms Viewed from the West
      • North Side of the Trombe Wall Forms
      • Trombe Wall Rebar and Concrete Form Panel Ties
      • Side Panels for Trombe Wall Forms
      • The Foreman Arrives to Inspect the Trombe Wall Forms
      • Concrete Form for Footer under Entry Wall
      • Trombe Wall Forms
      • Sheeting the First Story Addition
      • North and East First Floor Walls Framed
      • Framing of the First Floor Addition Begins
      • Bite Taken out of the Roof
      • First Floor Plates Added on Addition
      • Floor Patch Complete with Consistent Subfloor Thro...
      • Shallow Entry Wall Framed
      • Replacing the Bathroom Floor: New Floor Joists and...
      • Old Douglas Fir Floor Under the Oak Floor
      • Framing Begins on the Patio Entrance
      • New Ceiling Joists with the Old Joists Recycled an...
      • New Ceiling Joists Go Up
      • East Wall Finished, Ceiling Joists Removed
    • ►  April (26)
    • ►  March (40)
    • ►  February (5)
    • ►  January (1)
  • ►  2007 (1)
    • ►  May (1)

What we are reading...

  • CASTarchitecture
  • Fab.com | daily design for everyone
  • Green design will save the world | Inhabitat
  • MoCoLoco
  • Remodelista: Sourcebook for the Considered Home

Ads by Clickochet!

Ads by Clickochet!

Picture Window theme. Powered by Blogger.