The story of a growing family redesigning and renovating their home to make it larger, greener, and more sustainable in an urban environment.
4.09.2011
First Floor Framing Begins
Floor joist hangers have been attached to the rear wall. The first floor will actually be inset into the foundation so we do not have to step down into the courtyard.
No comments:
Post a Comment